- ClientObereggen Spa
- Completed2005
- typologySki lift station
- LocationObereggen (BZ)
Division of building volumes and adaptation to the terrain. The building is divided into two structures that are offset in height. The smaller, lower-lying volume contains the station building for the lift system, while the adjoining, higher-positioned and three-level part of the building houses the entire technical facilities, storage areas, depot for chair sets, as well as garages for snow groomers and an open area with a petrol station. The roof is a steel construction with profiled and folded aluminum sheets as roofing.
Services
Master planning
Bundling of all necessary planning services and coordination and agreement as a single point of contact, interface-free from the concept study to completion.
Construction management
Supervision, support and coordination of the entire construction process, tendering and awarding, scheduling and cost management up to acceptance of the construction work.