Hotel Cristal

  • Client
    Thaler Family
  • Completed
    2024
  • typology
    Hotel with outdoor design
  • Location
    Obereggen (BZ)

9 weeks of construction time for the hotel on the slopes. The subject of the intervention is the southern wing of the building, which was built in the 1990s and adjoins the entrance hall. In view of the constantly growing demands of guests, both its functionality and its architectural quality no longer appear up-to-date and no longer meet today's standards. The structural measures include a redesign of the above-ground volume as well as a generous internal reorganisation of the rooms. The existing pitched roofs will be replaced by a green flat roof in timber construction, and the existing roof terrace will be extended via an access walkway to provide a unique view of the surrounding mountains. All facades will be adapted to the existing building and clad with exposed larch timber cladding.

Services

Planning

From the initial idea to the elaboration and visualisation of the design, through the approval planning to the detailed implementation planning of the entire building project

Construction management

Supervision, support and coordination of the entire construction process, tendering and awarding, scheduling and cost management up to acceptance of the construction work.

Interior design

Draft, planning and design of interiors, material, colour and furnishing concepts, organisation and coordination of the trades and monitoring of the entire construction progress.