+39 0471 065 000

© 2023 Pichler Architects. All Rights Reserved.

Administration
Bolzano South Tyrol (I)
Park Edison
Restaurant, Wellness,
Chalet, Housing
Montagna South Tyrol (I)
Manna
Resort
Headquarter
Lana South Tyrol (I)
H-B Engineering
  • 01 Park
    Edison
  • 02 Manna
    Resort
  • 03 H-B Engineering

Pichler
Architects

The architectural practice of Pichler Architects offers all the services needed to guarantee design, planning and execution quality, including the preparation of feasibility studies and concepts, planning, tendering and construction supervision, all the way to completion of the construction project.

Park Edison
Bolzano (BZ)
Commercial building
with Administration

0
architecture
awards
0
Team
members
0
Years
of experience
0
completed projects

Latest
projects

View all projects
About us
Architecture studio
based in Bolzano / South Tyrol

The path taken by a project between client and planner, whose starting point relies mostly on roughly outlined content and functional parameters, is marked by communication and mutual interaction between inputs and outputs but ultimately ends at a common objective - the finished structure. The individuality of the project starts with the character of the client and develops in line with the requirements and variable complexity, and ends in the stylistic idiom of the building. The role of the architect is to ensure the smooth guidance of a project in all its many facets, from idea to implementation, and is a key quality feature for the completed structure.

Learn more
Pichler Architects was founded by architect Walter Pichler in 1976
Pichler
/ architects

Latest news

View all news
House San Genesio / Under costruction
3 October, 2023

House San Genesio / Under costruction

Transformation through demolition in reconstruction into a new multi-generation house in an exclusive location The picturesque existing ensemble…

Learn more
Das Wanda / Under costruction
13 September, 2023

Das Wanda / Under costruction

Extension of a boutique hotel and B&B in Caldaro The new volume extends the existing building by 7…

Learn more
Production plant Mila step 3 / Completed
1 August, 2023

Production plant Mila step 3 / Completed

Extension of the existing logistics centre of the production plant towards the east The capacities of this area,…

Learn more